πŸ“Š Bulk Rank Checker Plugin 3.0.0 β€” Website-Linked Campaigns, Smart Filters & Performance Boost


WEBSITE-LINKED CAMPAIGNS, SMART CAMPAIGN FILTERS, SERP RESULTS VIEWER, AND IMPROVED PERFORMANCE β€” YOUR BULK RANK TRACKING JUST GOT SMARTER.

⬇ Download Bulk Rank Checker Plugin 3.0.0

We are excited to announce Bulk Rank Checker Plugin version 3.0.0 for SEO Panel β€” a major release that brings campaigns closer to your website structure, adds smart filtering to the Campaign Manager, and introduces a brand-new SERP results viewer so you can see exactly what the search engine returned for every keyword. Whether you manage rank tracking for one site or many, this update makes the whole workflow more organised and transparent.


πŸ†• What’s New in Version 3.0.0

🌐 Campaigns Are Now Linked to Websites

Campaigns in the Bulk Rank Checker are now directly associated with a specific website from your SEO Panel website list.

  • πŸ“Œ When creating or editing a campaign, you now select the website it belongs to β€” keeping your rank tracking neatly organised by site.
  • πŸ—‚ The Campaign Manager list now shows the Website Name alongside each campaign, so you can see at a glance which site every campaign is tracking.
  • πŸ”„ Existing campaigns are migrated automatically on upgrade β€” no data is lost and no manual reassignment is needed.

πŸ” New Campaign Manager Filters

The Campaign Manager now features two quick filters at the top of the list, making it easy to find exactly the campaigns you need:

  • 🌍 Website Filter β€” select any website from the dropdown to show only campaigns belonging to that site. Results update instantly without a page reload.
  • 🟒 Status Filter β€” filter campaigns by Active or Inactive to focus on what is currently running or what has been paused.
  • ⚑ Both filters work together seamlessly, making it fast to manage a large number of campaigns across multiple websites and users.

πŸ”Ž SERP Results Viewer

This is one of the most requested additions to the Bulk Rank Checker β€” the ability to see what the search engine actually returned when your keyword was checked.

  • πŸ“‹ The full SERP snapshot is now stored for every keyword and search engine run, giving you a complete picture of the competitive landscape at the time of the check.
  • πŸ‘ Click to view the SERP results directly from the report β€” a clean popup shows the ranked URLs returned by the search engine for that keyword on that date.
  • πŸ”— Each result in the SERP list is a clickable link, so you can quickly inspect competitor pages without leaving SEO Panel.
  • πŸ“… Results are stored historically, allowing you to review and compare SERP snapshots across different dates.

πŸ“§ Email Reports in PDF, CSV & HTML

Stay on top of your rankings without logging in β€” the Bulk Rank Checker can automatically email campaign reports to you and your team on a schedule.

  • πŸ“„ PDF reports β€” professional, print-ready documents ideal for client presentations and stakeholder meetings, delivered straight to the inbox.
  • πŸ“Š CSV reports β€” data-friendly exports perfect for importing into Excel, Google Sheets, or any analysis tool.
  • 🌐 HTML reports β€” fully formatted, interactive web reports viewable directly in any email client or browser.
  • πŸ“¬ Multiple recipients β€” add as many email addresses as you need so the whole team stays informed automatically.
  • ⏰ Flexible schedule β€” choose daily, every 2 days, weekly, or monthly delivery to match your reporting cycle.

πŸš€ Performance Improvements

Version 3.0.0 includes behind-the-scenes performance improvements that speed up report generation and campaign processing β€” especially noticeable on installations with a large volume of campaigns and historical results accumulated over time.


⚑ Key Features Recap

  • πŸ€– Automated bulk rank checking β€” track keyword positions across multiple URLs and search engines in a single campaign run.
  • 🌐 Website-linked campaigns β€” every campaign is now tied to a specific website for cleaner organisation and faster filtering.
  • πŸ” Smart Campaign Manager filters β€” instantly filter campaigns by website or status.
  • πŸ”Ž SERP Results Viewer β€” store and review the full SERP snapshot for every keyword and search engine run.
  • πŸ“Š Multiple report formats β€” get rank reports in HTML, PDF, or CSV format to suit your workflow.
  • πŸ“ˆ Graphical & detailed reports β€” visualise rank trends over time with charts and full tabular breakdowns.
  • πŸ“… Flexible scheduling β€” schedule report generation daily, every 2 days, weekly, or monthly.
  • πŸ“§ Automated email reports β€” send reports to multiple email addresses automatically for team collaboration.
  • πŸ—‚ Archived historical reports β€” access past reports to track ranking progress over time.
  • πŸ‘₯ Multi-user / multi-website support β€” manage campaigns for all websites and users from a single admin interface.
  • πŸ›  User type settings β€” configure limits on keywords, URLs, and search engines per user type.
  • πŸš€ Improved performance β€” faster report generation and campaign processing at scale.

πŸ“₯ Download

⬇ Download Bulk Rank Checker Plugin 3.0.0

πŸ’¬ Questions, issues, or feature requests? Open a ticket on our support forum or GitHub. We hope this release makes managing your keyword rank tracking campaigns faster, more organised, and more insightful than ever.